Landmark and YUCWMENLÚCWU partnered to remove a load restricted bridge and replace with a steel girder bridge with timber deck panels. The process involved temporary positioning of the bridge to provide equipment access during construction of the geosynthetic reinforced soil (GRS) abutments. The bridge provides access to timber from YUCWMENLÚCWU tenures, for sale at local mills.

Owner – YUCWMENLÚCWU (2016)