This project, in the Three Valley Gap area, included the installation of a temporary crossing to provide equipment access to the both sides of the stream. A 20 meter composite deck bridge was installed to provide industrial access on this Forest Service Road.
Owner – BC Hydro (2013)
Recent Comments