SCS was retained to remove the top of the earthen dam to allow others to drive sheet pile before rip rap was replaced on top of the dam.  This will allow BC Hydro to increase the storage capacity of the reservoir for downstream energy production while ensuring public safety.

Owner – BC Hydro (2016)