Inonoaklin Pad Replacement

Inonoaklin Pad Replacement

SCS was contracted by BC Hydro to install a riprap revetment pad and new poles near Inonoaklin Creek, which had shifted and was eroding the southwest bank along the right-of-way, putting the 3-pole structure at risk.  Moving the poles further away from the scoured...
Englishman Bridge

Englishman Bridge

This project, in the Three Valley Gap area, included the installation of a temporary crossing to provide equipment access to the both sides of the stream.  A 20 meter composite deck bridge was installed to provide industrial access on this Forest Service Road. Owner...