by RISE Communications | Apr 20, 2021 | Construction
Landmark and YUCWMENLÚCWU partnered to buttress the west side of the old CPR rail grade embankment at the site of a collapsed wooden culvert and associated washout. The project is located between Revelstoke and the head of the Arrow Lakes on the east side of the...
by RISE Communications | Apr 19, 2021 | Construction
SCS was contracted by Columbia Power Corporation to upgrade the Arrow Reservoir Boat Launch at Edgewood, BC. The project included the installation of rip rap protection, new steel piles and walkway on the existing boat launch. In addition to the launch improvements,...
by RISE Communications | Jan 19, 2017 | Construction
The District of Sicamous in cooperation with the Ministry of Highways and the Splatsin First Nation, designed an artwork project, welcoming travellers to Sicamous and the Splatsin Traditional Territory. Working in a constrained space, with the highway in full...
by RISE Communications | Apr 20, 2016 | Construction
SCS was retained to remove the top of the earthen dam to allow others to drive sheet pile before rip rap was replaced on top of the dam. This will allow BC Hydro to increase the storage capacity of the reservoir for downstream energy production while ensuring public...
by RISE Communications | Apr 20, 2016 | Construction, YUCWMENLÚCWU
Landmark and YUCWMENLÚCWU partnered to remove a load restricted bridge and replace with a steel girder bridge with timber deck panels. The process involved temporary positioning of the bridge to provide equipment access during construction of the geosynthetic...
by RISE Communications | Apr 20, 2016 | Construction
In 2013, Columbia Power Corporation (CPC) on behalf of BC Hydro contracted SCES to remove the deteriorating timber/pile supported boat ramp at Nakusp BC (Arrow Lake) and replace it with a concrete launch. The new concrete ramp is comprised of a combination of...
Recent Comments