Checkerboard GRS Wall

Checkerboard GRS Wall

An existing road had several small failures and the gabion wall was being compromised, resulting in road closure. Using geosynthetic reinforced soil (GRS), the wall was extended and the road rebuilt. As a safety precaution, traffic control was in place on the highway...
Eagle River Bank Stabilization

Eagle River Bank Stabilization

SCS was contracted by Ministry of Transportation and Infrastructure (MOTI) to install several rock groynes and engineered log jams to protect agricultural land adjacent to Eagle River.  These structures direct the water flow into the middle of the channel and reduce...
Inonoaklin Pad Replacement

Inonoaklin Pad Replacement

SCS was contracted by BC Hydro to install a riprap revetment pad and new poles near Inonoaklin Creek, which had shifted and was eroding the southwest bank along the right-of-way, putting the 3-pole structure at risk.  Moving the poles further away from the scoured...
Englishman Bridge

Englishman Bridge

This project, in the Three Valley Gap area, included the installation of a temporary crossing to provide equipment access to the both sides of the stream.  A 20 meter composite deck bridge was installed to provide industrial access on this Forest Service Road. Owner...